The client called us with two emergency projects that needed expedited wayfinding signage within a few days. They were facing a looming deadline with their client and delays in obtaining the C of O for both facilities due to lack of the required wayfinding signage per City code.
We mobilized immediately, performed a site inspection to survey their requirements and put a rush on the production of the signage. We delivered and installed within the specified time frame and got the job done without a hitch.